Let us make BBS of the stormwater drain as shown below.
Given data:
RCC pardi depth = 450mm.
RCC pardi width = 150mm.
Drain bed width = 850mm.
Drain bed thickness = 150mm.
Stormdrain length = 8m.
Clear cover = 50mm.
Calculation:
A. Cutting length:
Given data:
Drain pardi vertical reinforcement = T10 @ 200c/c
Drain pardi horizontal reinforcement = T8 @ 175c/c.
Drain bed reinforcement-1= T10 @ 150c/c.
Drain bed reinforcement-2 = T8 @ 175c/c.
1. Drain pardi vertical reinforcement:
a. Cutting length of outer vertical reinforcement
= [ {a } + {b} + {c } + {d } - (2nos.× 90° bend)]
= [{pardi width -(2nos.× cover)} + {(pardi depth - cover) + (bed thickness -cover- bed reinforcements )}+ {pardi width -cover} + {175mm.} - ( 2nos. × 2d)]
= [{150mm. -(2nos.× 50mm.)} + {(450mm. - 50mm.) + (150mm. - 50mm.-10mm.-8mm. ) }+ {150mm. -50mm.} + {175mm.} - ( 2nos. × 2 × 10mm. )]
= [{50mm.} + {482mm.} + {100mm.} + {175mm.} - (40mm.)]
= 767mm.
= 0.767m.
b. Inner vertical reinforcement
Cutting length of inner vertical reinforcement
= [ {a } + {b} + {c } + {d } - {2nos.× 90° bend}]
= [{pardi width -(2nos.× cover)} + {(pardi depth - cover) + (cover + top bed reinforcements )}+ {cover} + {175mm.} - {2nos. × 2d}]
= [{150mm. -(2nos.× 50mm.)} + {(450mm - 50mm.) + (50mm + 10mm. +8mm. )}+ {50mm.} + {175mm.} - {2nos. × 2 × 10mm.}]
= [{50mm.} + {468mm.} + {50mm.} + { 175mm.} - {40mm.}]
= 703mm.
= 0.703m.
2. Drain pardi horizontal reinforcement:
Cutting length of horizontal reinforcement
= [ drain length - (2nos. × cover)]
= [ 8000mm. - ( 2nos. × 50mm.)]
= 7900mm.
=7.9m.
3. Drain bed reinforcement -1:
Cutting length of bed reinforcement-1
= horizontal reinforcement of pardi = 7900mm.= 7.9m.
4. Drain bed reinforcement -2:
Cutting length of bed reinforcement -2
= [{2nos. × a} + {b} - {2nos. × 90° bend}]
= [{ 2nos.×( bed thickness - 2nos. × cover)} + {bed width - 2nos. × cover} -{2nos. × 2d}]
= [{ 2nos.× ( 150mm. - 2nos. × 50mm.)} + {850mm. - 2nos. × 50mm.} -{2nos. × 2 × 8mm.}]
= [ { 100mm.} + {750mm.} - {32mm.}]
= 818mm. = 0.818m.
Note: Cutting length of top & bottom reinforcement -2 is equal.
B. No. of bars:
1. No of drain pardi vertical bar
= [(drain length - 2nos. × cover) ÷ c/c distance] +1
= [8000mm. - 2nos. × 50mm.) ÷ 200mm.] +1
= 39.5 +1
= 40.5
By rounding off = 41nos.
2. No of drain pardi horizontal bar
= [(pardi depth - cover) ÷ c/c distance] +1
= [(450mm. - 50mm.) ÷ 175mm.] +1
= 2.28 +1
= 3.28nos.
By rounding off = 4nos.
3. No of drain bed bar-1
= [(bed width - 2nos. × cover) ÷ c/c distance] +1
= [(850mm. - 2nos. × 50mm.) ÷ 150] +1
= 5+1
= 6nos.
4. No of drain bed bar-2
= [(drain length - 2nos. × cover) ÷ c/c distance] +1
= [(8000mm. - 2nos. × 50mm.) ÷ 175] +1
= 45.14+1
= 46.14
By rounding off = 47nos.
Total no. of bed bar-2 for top & bottom
= [2sides × 47nos.]
= 94nos.
Now, let us prepare a BBS table for the stormwater drain.
Sl. No. |
Type of Bar |
Dia. in mm. |
Nos. |
Length in m. |
Total length in m. |
Weight in Kg/m. |
Total bar wt. in kg. |
1. |
Drain pardi vertical bar. |
|
|||||
a. |
Outer bar. |
10 |
41 |
0.767 |
31.447 |
0.612 |
19.24 |
b. |
Inner bar. |
10 |
41 |
0.703 |
28.823 |
0.612 |
17.64 |
2. |
Drain pardi horizontal bar |
8 |
4 |
7.90 |
31.60 |
0.395 |
12.48 |
3. |
Drain bed Bar-1 |
10 |
6 |
7.90 |
47.4 |
0.612 |
29.00 |
4. |
Drain bed Bar-2 |
8 |
94 |
0.818 |
76.89 |
0.395 |
30.37 |
5. |
Total weight of bars = |
108.73 |
|||||
6. |
Add 3% wastage = |
3.26 |
|||||
7. |
The grand total wt. of rebar's = |
112.00 |
Note:
1. The depth of the stormwater drain varies according to the road level & slope. But to understand the calculation, a constant value is taken.