Let us make BBS of the pile cap as shown below.
The pile cap section is shown below mentioning different terms used while doing BBS calculations.
Given data:
Length of the pile cap = 3200mm.
Width of the pile cap = 2500mm.
Depth of the pile cap = 1500mm.
Clear cover = 50mm.
Pile cutoff length = 75mm.
Bottom bar layer-1 =20∅ @ 125 c/c.
Bottom bar layer-2 =20∅ @ 125 c/c.
Top bar layer-1 =12∅ @ 150 c/c.
Top bar layer-2 =12∅ @ 150 c/c.
Side face or roundup bar = 12∅-5 nos.
Calculation:
A. Cutting length:
1. Bottom bar layer-1:
Cutting length of the bottom bar layer-1
= [pile width + (2nos.× a ) - {(2nos. × clear cover ) + (2nos. × side face bar dia.) + (2nos. × 1/2 × bar dia.) + (2nos.× 90° bend)]
Where a
= [(1/2 × pile cap depth) + (1/2 × 300mm.) - pile cutoff - clear cover - (1/2 × bar dia)]
= [ (1/2 × 1500mm.) + ( 1/2 × 300mm.) - 75mm. - 50mm. - ( 1/2 × 20mm.)]
= [ 750mm. + 150mm. - 75mm. - 50mm. - 10mm.]
a = 765mm.
& 90° bend = 2d.
Cutting length of the bottom bar layer-1
= [2500mm. + (2nos.× 765mm. ) - {(2nos. × 50mm.) + (2nos. × 12mm.) + (2nos. × 1/2 × 20mm.) + (2nos.× 2 × 20mm.)]
= [ 2500mm. + 1530mm. - { 100mm. + 24mm. + 20mm. + 80mm.}]
= [ 4030mm. - 224mm.]
= 3806mm.
= 3.806m.
2. Top bar layer -1 :
Cutting length of the top bar layer-1
= [pile cap width + (2nos.× b ) - {(2nos. × clear cover ) + (2nos. × side face bar dia.) + (2nos. × 1/2 × bar dia.) + (2nos.× 90° bend)]
Where b
= [(1/2 × pile cap depth) + (1/2 × 300mm.) - clear cover - (1/2 × bar dia)]
= [ (1/2 × 1500mm.) + ( 1/2 × 300mm.) - 50mm. - ( 1/2 × 12mm.)]
= [ 750mm. + 150mm. - 50mm. - 6mm.]
b = 844mm.
& 90° bend = 2d.
Cutting length of the top bar layer-1
= [2500mm. + (2nos.× 844mm. ) - {(2nos. × 50mm.) + (2nos. × 12mm.) + (2nos. × 1/2 × 12mm.) + (2nos.× 2 × 12mm.)]
= [ 2500mm. + 1688mm. - { 100mm. + 24mm. + 12mm. + 48mm.}]
= [ 4188mm. - 184mm.]
= 4004mm.
= 4.004m.
3. Bottom bar layer-2:
Cutting length of the bottom bar layer-2
= [pile cap length + (2nos.× c ) - {(2nos. × clear cover ) + (2nos. × side face bar dia.) + (2nos. × 1/2 × bar dia.) + (2nos.× 90° bend)]
Where c
= [(1/2 × pile cap depth) + (1/2 × 300mm.) - pile cutoff - clear cover - bottom bar layer-1 dia - (1/2 × bar dia)]
= [ (1/2 × 1500mm.) + ( 1/2 × 300mm.) - 75mm. - 50mm. - 20mm. - ( 1/2 × 20mm.)]
= [ 750mm. + 150mm. - 75mm. - 50mm. -20mm. - 10mm.]
c = 745mm.
& 90° bend = 2d.
Cutting length of the bottom bar layer-2
= [3200mm. + (2nos.× 745mm. ) - {(2nos. × 50mm.) + (2nos. × 12mm.) + (2nos. × 1/2 × 20mm.) + (2nos.× 2 × 20mm.)]
= [ 3200mm. + 1490mm. - { 100mm. + 24mm. + 20mm. + 80mm.}]
= [ 4690mm. - 224mm.]
= 4466mm.
= 4.466m.
4. Top bar layer -2 :
Cutting length of the top bar layer-2
= [pile cap length + (2nos.× d ) - {(2nos. × clear cover ) + (2nos. × side face bar dia.) + (2nos. × 1/2 × bar dia.) + (2nos.× 90° bend)]
Where d
= [(1/2 × pile cap depth) + (1/2 × 300mm.) - clear cover - top bar layer-1 dia. - (1/2 × bar dia)]
= [ (1/2 × 1500mm.) + ( 1/2 × 300mm.) - 50mm. - 12mm. - ( 1/2 × 12mm.)]
= [ 750mm. + 150mm. - 50mm.- 12mm. - 6mm.]
d = 832mm.
& 90° bend = 2d.
Cutting length of the top bar layer-2
= [3200mm. + (2nos.× 832mm. ) - {(2nos. × 50mm.) + (2nos. × 12mm.) + (2nos. × 1/2 × 12mm.) + (2nos.× 2 × 12mm.)]
= [ 3200mm. + 1664mm. - { 100mm. + 24mm. + 12mm. + 48mm.}]
= [ 4864mm. - 184mm.]
= 4680mm.
= 4.68m.